Phone

+123-456-7890

Email

[email protected]

Opening Hours

Mon - Fri: 7AM - 7PM

Older user interfaces don’t crumble overnight. They crumble bit by bit, when it takes two seconds longer for their checkout process to load compared to that of their competitor, when the dashboard can’t accommodate an extra piece of data without the involvement of developers, when the accessibility test finds contrast ratios that were never supposed to be there. The development team can put up with this problem, as the other alternative is even worse. It means stopping coding and running two pieces of software at once.

These six agencies below have come up with another approach to redesigning their legacy interfaces. Instead of rebuilding everything at once, they redesign each screen individually. The older version stays functional as a backup until each redesigned screen is passed through testing. Release of the product keeps going on. Some of the agencies apply this delivery approach along with EAA accessibility compliance requirements built into their design system.

The selection criteria were very limited. Each company had to have public proof of its work on existing, aging products and not just on greenfield builds. Each company had to have a delivery approach that doesn’t involve taking the product down. And each company had to demonstrate the connection between design decisions and engineering decisions.

What Downtime Really Costs During a UI Rebuild

The explicit cost of outages is a number on a status page. The implicit cost lurks in the moments before and after.

There are delays to product launches. Support is inundated with tickets related to bugs that have already been resolved in the new product but have yet to be released. Sales are showing off the old user interface because the new one is flagged by features. Engineering is torn between the move and the backlog.

With a gradual roll-out strategy, everything looks different. UI elements switch one-by-one, each with its own release pipeline. In case one of the new screens fails to load, the old screen will appear automatically and will restore product functionality without a full product outage. A gradual roll-out of the screens splits risks between manageable components.

Accessibility presents another level of complexity. European Accessibility Act entered the enforcement phase for any new product and service since 28 June 2025. Those services that were already provided by the date mentioned above have some grace period

1. Softonix

Softonix redid a live HR platform for Canadian dealerships without interrupting its operation. The platform had over 10,000 users per day accessing it on more than 100 screens, and initially we were requested to update the front end.

After we reviewed the codebase, however, the project scope was extended to cover a full legacy front-end modernization. The new front end was created using Vue 3, TypeScript, and Tailwind within modules, while the old C#/.NET back end continued to work as before. The new screens were created one by one, while the legacy version was still accessible as a backup. AI functionality came later, in 2024, based on the new architecture.

How Softonix can help with zero-downtime frontend rebuild services:

  • Build screens in modular pieces so that every release bears low risk and the old screen is available until the new one is approved.
  • Use the old backend but add new things only to support the new UI features the old one did not provide.
  • Consider accessibility guidelines as part of the design system from day one and not as an after-the-fact audit.
  • Start with a fixed-price UX and code audit that would decide whether to proceed with gradual replacement or complete rewrite.

Where this fits a product team: a live system with active users and a frontend that cannot absorb new features without destabilizing existing workflows.

2. Boldare

Legacy Modernization at Boldare is carried out as a phased project of fixed price as opposed to a full cutover. Phase one includes the readiness scan that identifies the technical debt, migration risk, and the roadmap in three to five business days. Migration phase involves migration per module, where feature flags maintain production all through the process.

There have been publications by Boldare on migrating a SaaS front-end from AngularJS to React and also about migrating PHP and the framework version incrementally to ensure that features continue rolling out during the process. Boldare has developed more than 300 products since 2004 and groups its teams in scrums with working increments within one or two weeks.

How Boldare can help with incremental modernization and production continuity:

  • Feature-flag migration keeps the live product running while new modules replace legacy ones behind controlled releases
  • A fixed-price readiness scan produces a go or no-go recommendation before a larger migration budget is approved
  • Module-level migration sprints let the team ship new features alongside the modernization work rather than pausing the roadmap
  • AI-assisted code transformation and documentation reduce the manual effort that usually extends legacy projects

The trade-off to weigh: the phase-based model suits teams that can plan in modules, and organizations expecting a single accelerated cutover may find the cadence slower than their timeline allows.

3. DEPT

The C&A e-commerce platform migration was done by DEPT in phases; the frontend maintenance of the current store was done first, followed by the move to the architecture of headless microservices with an SPA front end. This happened alongside C&A’s internal teams, where there was a cross-product design system with new front-end and back-end components.

DEPT has been able to build zero-downtime deployment foundations for RIBA during the Sitecore upgrade and cloud migration. DEPT has more than 4,000 people working in over 30 offices, and their Clutch score is 4.8. UI modernization with zero downtime requires staging the architecture change, not replacement.

How DEPT can help with staged platform migration and deployment continuity:

  • Coordinate the frontend-backend transition across stages to ensure the current store remains operational even as the new architecture is being built
  • Create a cross-product design system that will go through migration and not redesign screens as a result of platform migration
  • Create deployment processes that allow for zero-downtime releases in case of infrastructure or platform upgrade
  • Collaborate with product/UX teams internally to ensure that migration maintains the internal context and does not replace it

DEPT’s delivery structure assumes a program large enough to absorb a multi-phase migration, so leaner product teams may want a partner sized to their release cadence.

4. ustwo

ustwo’s approach for Dojo involved product design skills within a payments company which is expanding. A ten-member product and design team spent six months as part of the Dojo design team and incorporated accessibility standards into their definition of done for the product squad teams. Accessibility standards matter because, in terms of compliance with EAA, this meant that they were included in the actual delivery process and not simply an outside document.

Ustwo is another company that publishes design systems over several years with a focus on Figma kits, front-end libraries, documentation, and accessibility information for enterprise products. Ustwo creates digital products in their entirety and also assists with technological transformations.

How ustwo can help with accessibility-led redesign and embedded delivery:

  • Embed design and product leadership inside the client team so accessibility rules become part of sprint acceptance rather than a later checklist
  • Pair external designers with internal squads to transfer knowledge while the redesign moves forward
  • Build design systems that include front-end libraries and documentation, giving engineers a direct path from design decisions to implementation
  • Bring accessibility expertise into the team through workshops and standards that shape how squads define ready and done

A practical fit for: organizations that need design capability built inside their teams while a legacy interface is reworked, not a pure handoff engagement.

5. Merge

Merge works through the legacy interface via the design file interface prior to deployment of the screens to production. For the engagement of community platform, Merge conducted audits on legacy Figma files, identified discrepancies between mocks and live product, and updated the libraries to match handoffs with engineers’ builds.

To design a new experience of using a cryptocurrency tax product with an out-of-date application, Merge made up to 400 mocks. This firm is rated 4.9 by Clutch among other reviews, with 67 total. It also offers a monthly UX package for a $3,200 minimum. Agencies that both design and build products need a clear handoff from the former process to the latter. And Merge is helping with the former part of that handoff.

How Merge can help with design-layer cleanup before a rebuild:

  • Audit legacy design files and align mockups with the live product so the rebuild starts from an accurate reference
  • Rebuild component libraries and naming structures that engineers can implement without guessing which file is current
  • Produce high-volume mockup coverage for products with many screens, reducing the chance that states get missed during development
  • Scope design QA separately when a client wants formal validation during the build phase

The limitation to note: Merge is a design agency, and teams that need the same group to write production backend code will need an engineering partner alongside it.

6. Cieden

The interfaces at Cieden have been modernized after over a decade of age. In one of their Clutch reviews, there is a description of the 12-year-old web suite interface being built anew. The portfolio of Cieden includes conducting UX audit services for products that look outdated and are difficult for customers to use. The studio designs the BPM software to interface with WCAG and adjust navigation for people with disabilities.

Cieden is a UX/UI studio of 10 to 49 employees that was founded in 2016, with a 4.9 rating from 46 Clutch reviews. They have fintech and healthcare industries taking up 60 percent of the portfolio mix. European product design studios specializing in complex B2B interfaces operate in this layer of legacy product redesign.

How Cieden can help with legacy interface audits and WCAG-aligned redesign:

  • Audit outdated interfaces for usability, accessibility, and user-flow friction before a rebuild scope is set
  • Rebuild aging web suites as new design systems rather than layering fixes onto the existing interface
  • Align navigation and component contrast to WCAG standards so accessibility is part of the redesign rather than a separate project
  • Focus on complex B2B and enterprise products where data-heavy screens and multiple user roles make legacy problems harder to isolate

A boundary worth knowing: Cieden works in UX/UI design and does not offer branding or engineering delivery, so the build phase needs a separate partner.

Final Thoughts

The downtime that can happen during the redesign is a consequence of choices, not the laws of physics. You may find different ways to reduce downtime in this process, provided by the following agencies:

  • Softonix and Boldare refresh the screens in modules, maintaining the legacy as an extra option;
  • DEPT makes architectural transitions step-by-step;
  • ustwo makes accessibility a part of the delivery process, to make sure that the redesigned interface won’t be another problem for compliance; 
  • Merge cleans the design layer, allowing engineers to do the work based on the clean files;
  • Cieden re-audits and re-designs the old interfaces, making them WCAG-compliant at the component level.

Everything depends on the risks that the product is facing. A live application with a constant flow of users should have another path to follow for each screen that is getting updated. The agency operating under the EAA deadline needs an accessible design system.

The product with decades of undocumented design files obviously needs cleaning of the reference layer first. Those frontend rebuild services that don’t take that into account will face the downtime that they aimed to get rid of.

Recommended Articles